Project Overview
Facility Area: 2,000 m²
Designed Capacity: 30-40 tons/day,80 tons/day(peak season)
Target Products: 3A bottle bales
Customer Pain Points
Severe capacity bottlenecks.
During peak seasons the inbound volume can double, and the only way to avoid stock-pile overflow is to add more manual labor.
Low sorting purity.
Because the feedstock is complex, manual sorting can achieve only first-grade blue-white separation.
High labor costs.
The sorting line alone needs 6–7 workers, and turnover is high.
Difficult to scale.
Workshop-style workflows and management practices are hard to replicate on a larger scale.
Project Outcomes
45% Higher Throughput
20% Higher Profit
40% Lower Labor Cost
Dongguan Medium-sized Plastic Baling Station
"I was one of Justra's early customers, back when they had few baling station references. Their technical strength and service left a deep impression and ultimately led to our cooperation. Once implemented, their equipment helped us solve peak-season labor shortages and warehouse overflow. It also enabled us to upgrade from basic blue-white grade bottle to 3A-grade bottle, greatly increasing both capacity and profit."